Usually these estimates will be free.
Lp lap siding installation guide.
Lp smartside trim and fascia installation instructions.
Featured how to install lp smartside trim siding.
Placement may vary as required by course lay out.
See figure 11b snap a level chalk line 3 3 8 above the bottom of where the first course of siding will start.
X 1 1 2 in 1 4 in.
Blind nail to wall framing.
Penetrate structural framing or wood structural panels and structural framing a minimum of 1 1 2 in.
Install flashed water table at foundation.
Lp smartside precision series soffit installation instructions.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Trim and fascia must be applied in a manner that will not allow moisture intrusion or water buildup.
1 clearance between siding and roofing clean rain gutter do not run siding or trim inside of the kick out flashing trim should be thick enough so the lap siding does not extend beyond the face of the trim.
Lp smartside 38 series lap siding may be attached directly to framing members that are spaced up to a maximum of 16 in.
Lap siding cost estimates may require an onsite inspection.
Align the top of the metal starter strip on the chalk line.
Check your local building code before starting to install the sid ing to confirm if wall sheathing is required.
Use hot dipped galvanized nails with a minimum 0 270 in.
Labor tasks layout fabricate and attach primed plank siding 6 width over vapor barrier.
Lp smartside precision series lap siding installation instructions.
Rigidstack metal starter strip will set the exact placement for the 1st course of rigidstack.
Application guide spanish installation.
Nail a starter strip wood lath or siding approximately 3 8 in.
Find product specifications warranties installation instructions and msds for all lp building solutions in our product literature resource center.